The Strategies

Following on from the Masterplan we have now developed two further strategies: the Seafront  Strategy and Public Realm Strategy, in partnership with EDAW.

In addition to these, DTZ have completed a development brief  for us on the Retail Core, and an options report of the Cultural and Civic Hub site. These documents are listed below:

Final Reports

Seafront Strategy Final
Public Realm
Retail Core Development brief- FINAL
Cultural and Civic Hub- FINAL Report
Cultural and Civic Hub- FINAL matrix & Commentary

Listed below are PDFs showing the full Worthing Masterplan, which are able to be downloaded. If you do not have a PDF reader please see our Accessibility section for a link to Adobe Reader.

Please note that the comprehensive nature of the Masterplan means some of these files are large in size and may take time to download. Please be patient whilst the file downloads. We recommend saving the documents to your computer first before viewing, rather than clicking on the links directly.

Masterplan

Complete Worthing Masterplan

The Vision
Introduction and Key Issues
Masterplan Proposals
Delivery
Opportunity Sites
Seafront Strategy
Public Realm
Transport Strategy

Baseline Data

Donaldsons Viability Report
EDAW Stage 1 Consultation Report
Final Phase Consultation
Property Market Overview
Sustainability Study
Sustainability Appendices
Tourism Study
Transport Study/Issues and Strategies

Aquarena Draft Development Brief

The draft development brief for the Aquarena from Consultants GVA Grimley commissioned in May 2009, written to guide future development.

Aquarena Draft Dev Brief

Public Art Strategy

The Public Art Strategy undertaken by Frances Lord (Artist Consultant) and Steve Geliot (Lead Artist/Artist Consultant) developed in Summer 2009

Public Art Strategy

Operating Protocol

The Operating Protocol acts as an informal agreement between Worthing Masterplan Board and Worthing Borough Council. The documents sets out the roles and responsibilities of the Masterplan Board, Sub Groups and Programme Team.

Operating Protocol

Masterplan Leaflet March/April 2009

The Masterplan leaflet is a document with snippets of the latest project updates, the leaflet is updated when we have new projects coming to the fore of our programme - the next leaflet will be available September 09.

Leaflet March 09

Worthing's Cultural Heart Unveiled

The document below was written as an supplementary document to an application for CABE's Sea Change Programme, and highlights the cultural elements which have become part of the Splash Point regeneration Project

Worthing's Cultural Heart Unveiled

BDP Designs (for Street Furniture & Paving schemes)

The document below was drawn together by consultants BDP for the Street Furniture and Paving project as part of the Public Realm improvements.  New seating, cycle racks, bins etc have now been installed in various locations through the town and seafront.

BDP Street furniture and paving

Ustigate Water Feature Feasibility Studies

Ustigate were the consultants appointed to carry out water feature feasibility studies for two locations in Worthing. South Street Square and Splash Point. While the possibility of having water features for Worthing have not been decided, it is hoped that the water play element could be incorporated into the new Swimming Pool. Once the Swimming Pool has been agreed and works commence, the Water Feature Reports will become available in due course.